March 2019
low
A precision machining shop in Sheffield, 18 staff.
Problem
Work came from three long standing customers and whoever they mentioned the shop to, which had been enough for a decade and was no longer. Their only other source was one trade show costing about 20,000 a year that produced four months of work.
Solution
Design engineers at firms already making the kind of part they machine got an email asking for a sample run rather than a contract, and at shops under 20 staff it went to the owner instead, since there is no separate engineer. The first list was buyers and procurement, who forwarded everything and replied to nothing. Moving up to the engineer who specifies the part changed it.
Result
16 positive replies, $32,000 of pipeline at the $2,000 sample run. Every reply was passed over to their team. Engineers replied with drawings attached, which buyers never did.